15 men can do a job in 12 days and 18 women can do it in 15 days. How many days will 5 men and 3 women take to complete the job ?
28(57)
25(57)
23(57)
27(57)
The correct Answer is:B
To solve the problem, we need to find out how many days 5 men and 3 women will take to complete a job, given that 15 men can do the job in 12 days and 18 women can do it in 15 days.
1. Calculate the work done by men in one day:
- If 15 men can complete the job in 12 days, then the total work can be expressed in man-days.
- Total work = Number of men × Number of days = 15 men × 12 days = 180 man-days.
2. Calculate the work done by women in one day:
- If 18 women can complete the job in 15 days, then the total work can also be expressed in woman-days.
- Total work = Number of women × Number of days = 18 women × 15 days = 270 woman-days.
3. Find the work done by one man and one woman in one day:
- Work done by one man in one day = Total work / Total man-days = 180 man-days / 15 = 12 man-days per man.
- Work done by one woman in one day = Total work / Total woman-days = 270 woman-days / 18 = 15 woman-days per woman.
4. Convert the work done by women to man-days:
- To compare the work done by men and women, we can find the equivalent work done by women in terms of man-days.
- Since 1 man can do the work of 1 woman, we need to find the efficiency ratio.
- Let’s assume the efficiency of a man is M and a woman is W. From the previous calculations, we can set up the equation:
- 15M = 18W
- Therefore, M/W = 18/15 = 6/5.
- This means 1 man is equivalent to 1.2 women in terms of work done.
5. Calculate the combined work done by 5 men and 3 women in one day:
- Work done by 5 men in one day = 5 × M.
- Work done by 3 women in one day = 3 × W.
- Using the ratio, we can express the work done by men in terms of women:
- Work done by 5 men = 5 × (5/6)W = (25/6)W.
- Total work done by 5 men and 3 women in one day:
- Total work = (25/6)W + 3W = (25/6)W + (18/6)W = (43/6)W.
6. Calculate the total time taken by 5 men and 3 women to complete the job:
- Total work = 270 woman-days (from step 2).
- Time taken = Total work / Work done in one day = 270 / (43/6) = 270 × (6/43) = 270 × 6 / 43 = 1620 / 43 = 37.674 days.
7. Final Calculation:
- Rounding off, we can say that it will take approximately 38 days for 5 men and 3 women to complete the job.
- If 15 men can complete the job in 12 days, then the total work can be expressed in man-days.
- Total work = Number of men × Number of days = 15 men × 12 days = 180 man-days.
- If 18 women can complete the job in 15 days, then the total work can also be expressed in woman-days.
- Total work = Number of women × Number of days = 18 women × 15 days = 270 woman-days.
- Work done by one man in one day = Total work / Total man-days = 180 man-days / 15 = 12 man-days per man.
- Work done by one woman in one day = Total work / Total woman-days = 270 woman-days / 18 = 15 woman-days per woman.
- To compare the work done by men and women, we can find the equivalent work done by women in terms of man-days.
- Since 1 man can do the work of 1 woman, we need to find the efficiency ratio.
- Let’s assume the efficiency of a man is M and a woman is W. From the previous calculations, we can set up the equation:
- 15M = 18W
- Therefore, M/W = 18/15 = 6/5.
- This means 1 man is equivalent to 1.2 women in terms of work done.
- Work done by 5 men in one day = 5 × M.
- Work done by 3 women in one day = 3 × W.
- Using the ratio, we can express the work done by men in terms of women:
- Work done by 5 men = 5 × (5/6)W = (25/6)W.
- Total work done by 5 men and 3 women in one day:
- Total work = (25/6)W + 3W = (25/6)W + (18/6)W = (43/6)W.
- Total work = 270 woman-days (from step 2).
- Time taken = Total work / Work done in one day = 270 / (43/6) = 270 × (6/43) = 270 × 6 / 43 = 1620 / 43 = 37.674 days.
- Rounding off, we can say that it will take approximately 38 days for 5 men and 3 women to complete the job.
Similar Questions
8 men can do a work in 12 days while 20 women can do it in 10 days. In how many days can 12 men and 15 women complete the same work.
View Solution12 men and 15 women can do a work in 6 days, and 6 men and 12 women can do it in 10 days, in how many days can 8 men and 10 women do the same work?
View Solution
Knowledge Check
5 men can do a piece of work in 6 days while 10 women can do it in 5 days. In how many days can 5 women and 3 men do it?
A4 daysB5 daysC6 daysD8 days24 men can do a work in 16 days while 36 women can do the same work in 24 days. In how many days will 8 men and 6 women together complete the same work ?
A36 daysB28 daysC32 daysD24 days12 men and 16 women can complete a jon in 5 days. 13 men and 24 women can complete the same job in 4 days. How long, in days, will 5 men and 10 women take to complete the same job?
A5B12C10D15
6 men or 8 women can do a job in 10 days In how many days can 5 men and 9 women do the same job?
View SolutionA can do a job in 12 days and B can do the same job in 6 days, in how many days working together they can complete the job?
View Solution3 men or 5 women can do a work in 12 days. How long will 6 men and 5 women take to finish the work?
View Solution2 men and 7 women can do a piece of work in 14 days whereas 3 men and 8 women can do it in 11 days. In how many days 5 men and 4 women can do the same work?
View Solution12 men can complete a work in 16 days and 16 women can complete the same work in 12 days In how many days will 4 men and 8 women complete that work ?
View Solution